Recent projects.

manufacturing plant

WORLD-CLASS STEEL MANUFACTURER

 Kentucky

  • Connected new multi-billion-dollar plant directly to interstate pipeline

  • Greylock owns and operates this system:

    • 8-mile steel transportation infrastructure

    • Design, build, operate new M&R on client site

    • Design, build, operate new multi-million-dollar interconnection with interstate gas company

  • Met aggressive timeline

    • Under 7 months from definitive agreements​

  • Providing all end-user services

    • (e.g. pressure reduction, heating, odorization)​

  • Providing all compliance, maintenance, and repairs

compressor station

SHAWVILLE STATION & TRANSMISSION LINE

Pennsylvania

  • Developed and operated infrastructure system for 588 MW converted natural gas plant in PA

    • 19-mile high-pressure steel 16" gas transportation infrastructure​

    • 200 MMcf/D interconnect with BHE for bi-directional flow

    • FERC-certified

  • Directionally drilled bore underneath the Susquehanna River and added state-of-the-art measurement and regulation station collocated with the plant

  • Project was in-service in less than 12 months from construction start date 

  • >$35MM project

gathering station

GREENE GATHERING SYSTEM

Pennsylvania

  • Designed and constructed over 46 miles of dry-gas gathering pipelines and four stations in eastern Greene County, Pennsylvania.

  • Stations currently house more than 20,000 HP of leased and owned compression, and the system's total capacity is 300 MMcf/D.

  • Maintains and operates these assets year-round.

  • Oversees more than 150 MMcf/d in total system throughput and interconnects with TETCO, TC Energy, and Dominion.