Connected new multi-billion-dollar plant directly to interstate pipeline
-
Greylock owns and operates this system:
-
8-mile steel transportation infrastructure
-
Design, build, operate new M&R on client site
-
Design, build, operate new multi-million-dollar interconnection with interstate gas company
-
-
Met aggressive timeline
-
Under 7 months from definitive agreements
-
-
Providing all end-user services
-
(e.g. pressure reduction, heating, odorization)
-
-
Providing all compliance, maintenance, and repairs
-
Developed and operated infrastructure system for 588 MW converted natural gas plant in PA
-
19-mile high-pressure steel 16" gas transportation infrastructure
-
200 MMcf/D interconnect with BHE for bi-directional flow
-
FERC-certified
-
-
Directionally drilled bore underneath the Susquehanna River and added state-of-the-art measurement and regulation station collocated with the plant
-
Project was in-service in less than 12 months from construction start date
-
>$35MM project
-
Designed and constructed over 46 miles of dry-gas gathering pipelines and four stations in eastern Greene County, Pennsylvania.
-
Stations currently house more than 20,000 HP of leased and owned compression, and the system's total capacity is 300 MMcf/D.
-
Maintains and operates these assets year-round.
-
Oversees more than 150 MMcf/d in total system throughput and interconnects with TETCO, TC Energy, and Dominion.